top of page

PROJECT 1:

Industrialized Building System (IBS)

|| The Brief

In the first project, we were exposed to one of the new means of construction, which is through Industrialized Building System (IBS). We had to formed into a group of 5, and carried out a case study on an existing IBS in a current building,and configure a new design with implementations of IBS, to solidify our understanding with the concept of IBS. We need to produce a report documenting our floor plans, our schedule for each components, the construction process of an IBS building, as well as coming out with a physical model using the technique acquired by IBS. 

|| The Final Report
|| The Final Model
IMG-20180708-WA0017
IMG-20180708-WA0014
IMG-20180708-WA0015
IMG-20180708-WA0016
IMG-20180708-WA0020
IMG-20180708-WA0019

© 2019 by CHAM ZHENG CHEE

  • Facebook Black Round
  • Instagram Black Round
bottom of page